Skip to main content

What needs are

Needs are the outcomes or goals your stakeholders care about. They are the “why” behind the features you are considering, and the pivot of a Weighted project: stakeholders rate how much they want each need, and features are rated on how much they deliver each one. Nothing is scored against anything else. Good needs are outcome-focused, not solution-focused. Instead of “build a mobile app”, write “field staff can work away from a desk”. Direct projects have no Needs tab.
Your project may call these objectives or something else. See Vocabulary.

Adding a need

  1. Open the Needs tab
  2. Click Add need
  3. Give it a title and, optionally, a category and a description
  4. Save
Category is free text with a list of the categories already in use, so a project settles on its own handful of groupings. The tab groups needs by category, and a category can be renamed in place from its header. There is no limit on the number of needs, but 3 to 8 tends to give the clearest analysis: stakeholders can rate them thoughtfully, and coverage stays legible.

Evidence

Each need can carry links that back it: research notes, support tickets, dashboards, anything with a URL. Open the need and add a link with an optional label. Evidence does not affect any score. It is there so that a reader of the Decision Report, or a stakeholder deciding how to rate, can see where the need came from.

Reading the cards

Each need is a card. Once the project has stakeholder answers and features, every card gains a footer with two readings:
  • Importance: the weighted average of the ratings given so far, 1 to 5, with “N of M answered” while some stakeholders have not yet responded. Abstentions count as answered but not as ratings.
  • Delivery: how many features currently deliver this need on Coverage, or an amber No feature yet when nothing does.
The tab header carries a meter of how many needs are delivered by at least one feature. A need nothing delivers is the clearest signal in the project: either a feature is missing from your list, or the need does not belong in this cycle.

Editing and deleting

Click a need to edit its title, category, description and evidence. Deleting a need removes every rating stakeholders gave it and every coverage link to it. This cannot be undone.

Tips

  • Write the description as if for a stakeholder who will rate the need without you in the room. The voting portal shows it.
  • Keep needs at one level of abstraction. A list that mixes “platform reliability” with “fix the export timeout” produces ratings nobody can compare.
  • The assistant can propose a first set of needs from a description of the decision. See AI in Weivo.